您當前所在的位置:

首頁 > Quality of Buildings Works Diagnostic and Consultation Service

Quality of Buildings Works Diagnostic and Consultation Service

2021-09-09

Buildings Diagnostic and Inspection Service

 

Our professional team includes Chartered Building Surveyor, Chartered Building Engineer, Chartered Builder, Authorized Person, Registered Structural Engineer, etc. to provide services includes quality of works assessments, renovation works delays disputes and unreasonable deduction of deposits by the owner, any dispute arising from the handover of the building or department, etc. Our professionals provide court-approved reports and expert witness service, including repair works recommendations and loss estimation.

 

The main assessment areas include:

 

- Contract amount payable

 

Quality of Works (whether it meets the general receiving standards)

 

-The degree of completion of the project

 

Determine Man-made damage/natural wearness

 

 

Property damage recorded and repair works amount estimation due to the above-mentioned reasons

 

 

Remarks: The burden of proving the loss (Burden of Proof) is the responsibility of plaintiff. If you seek for compensation, please contact us as soon as possible to make better preparation. A lot of evidence of losses were collected at the very beginning. In many cases, the plaintiff did not properly collect/keep evidence of the losses, resulting in a significant reduction in compensation and even lost the opportunity to seek compensation.

 

 

If you have any enquiry, please call 6518 3092/5423 3828 (Enquiry hotline)

 

Q: Can the owner claim for damages if it is not completed within the contract period?

 

A: A licensed barrister said that the legal responsibility of the owner and the decoration company is based on the project contract. If the completion date is specified in the contract, and the decoration company fails to complete the delivery on time, it may be a breach of the contract, and the owner can claim compensation from the other party for the extension of the project. Derived losses, including hotel rentals, etc.

 

 

 

Q: Do I need to consider the reasons for project delays?

 

A: The answer is yes. The owner mainly considers the factors of project delay. If the project is delayed due to uncontrollable factors, such as the delay in the transportation of decoration materials and furniture, the owner has no reason to deduct the decoration fee. Therefore, the owner must first clarify the reason for the delay of the project. If there is evidence that the other party deliberately delays the project, in case the other party takes legal action to recover the decoration cost, the owner also has reasons to make a defense, and may even claim against the other party for compensation. If the amount claimed is less than HK$75,000, the owner can file a claim with the decoration company in the Small Claims Tribunal.

 

 

 

Q: How do I know if the compensation plan is reasonable?

 

A: When the owner signs the contract with the decoration company, the completion date should be clearly specified, and the compensation plan for overdue completion should be clearly stated. However, since the compensation is legally compensatory rather than punitive, the compensation amount should be based on a well-founded estimate. Otherwise, there is a chance that it will constitute unfair contract terms, which will affect future claims.

 

 

 

 

 

 

曾處理的法庭案件如下(由於案件眾多,未能盡錄):

愉景灣海澄湖畔二段

DCCJ 1529/2017

九龍亞皆老街124B號怡安閣

SCTC40384/2018

九龍樂富富強苑

DCCJ 2924-2014

新界元朗鳳琴街22號金龍樓1

SCTC007076/18

大埔露輝路38號聚豪天下

SCTC42098/2017

將軍澳頌明苑A座嘉明閣3203

SCTC042681/18

西環海怡花園

DCCJ 3878/2 014

中環結志街39-43號新中環大廈

DCCT712/ 2017

荃灣橫龍街49-53 號華隆工業大廈

DCCJ 4468-2015

海怡半島

DCCJ 1992/2016

葵涌榮芳路79號葵樂大廈

DCCJ 4803-2016

元朗教育路9-13號興發大樓

SCTC50266/2018

灣仔莊士敦道172號美華大廈

DCCJ 4919/17

粉嶺祥華邨

SCTC 8952/2018

香港跑馬地誠和閣

DCCJ 4959-2015

太子汝州街19-25號英來大廈

DCCJ 2322/2015

沙田康林苑

DCCJ 3244-2015

荃灣柴灣角街95號華俊工業中心

SCTC4871248713 /2018

北角112號七姊妹道

DCMP1310/2016

馬鞍山錦英苑

SCTC 53785/18

馬鞍山新港城

SCT048853/16

羅便臣道80

SCTC038148/18

紅磡德康街黃埔花園

SCTC000271/16

觀塘月華街12號佳景樓

SCTC005408/19

荃灣怡康街海濱花園

SCTC002198/18

元朗鳳琴街 22號金龍樓2

SCTC8076/2018

九龍塘碧麗閣

SCTC036744/16

北角百福花園

DCCJ2287/2018

屯門田景路33號兆隆苑

DCCJ3081/2014

北角英皇道883號麗景閣

SCT021994/19

山頂僑福道4-18號環翠園

LDBM 78/2018

屯門多寶大廈

DCCJ2118/2019

沙田銀城街21號愉田苑

DCCJ2605/2016

愉景灣堤畔徑18號悅堤

DCCJ2287/2018

新界葵涌大龐街39號銀行大廈天台

DCCJ 5344/2016 & 4746/2016

長沙灣雙喜大廈

SCTC 21048/2019

旺角渡船街319號順興大廈

DCCT5369/2015

淺水灣南灣道61號華景園

DCCJ 3606/2015

Case Studies

Project: Tenant vandalism

Address:Florient Rise

Details: When the owner repossessed the building, he found that the walls, floors and a lot of furniture were deliberately damaged, so he hired our company to conduct an assessment and write an expert report on site.

On-site inspection photos:

 

Project: Renovation unfinished

AddressKornville

Details: After the decoration company undertook the project and received the deposit, the construction was delayed, and the completion date was delayed again and again. After the completion, the owner found that the workmanship was not good, did not meet the general delivery standards, and the materials could not be provided according to the contract requirements. Therefore, the owner failed to pay the remaining contract amount in accordance with the contract, and the decoration company subsequently claimed against the owner for the remaining payment. The owner thought it was unreasonable, so he hired the company to conduct an assessment and write an expert report on site.

 

On-site inspection photos:

 

 

最新消息

  • Contact Tel:3489 9268
  • Contact Tel:5423 3828/ 6518 3092 (Enquiry or appointment)
  • Whatsapp:5423 3828 (Enquiry or appointment)
  • Fax:3016 8638
  • Address:Unit 1304, Celebrity Commercial Centre, NO. 64 Castle Peak Road, Kowloon